The AVH Foundations family
Underpinning & basement lowering

More headroom. A stronger foundation. Done once.

Engineered underpinning that turns a low, damp basement into real living space, and stabilizes the footing while we're at it.

Call (289) 880-7988
5-star Google reviewsFamily-owned & operatedOur own crew, never subcontractors
Basement underpinning in progress: soil bench excavated under a block foundation wall with temporary steel shoring
Is this you?

Signs you need underpinning & basement lowering

  • Basement ceiling under 7 feet
  • Planning a legal apartment or in-law suite
  • Footings exposed, settling or undermined
  • Sloped lot and you want a walkout too
How we fix it

What actually happens

  1. 01

    Assessment & engineering

    We measure, check soil and footings, and get engineered drawings and the permit moving.

  2. 02

    Sequenced pins

    Sections are dug and poured in an engineered order so the house is always supported.

  3. 03

    New floor & drainage

    New slab, weeping tile and sump where needed. Waterproofed while everything is open.

  4. 04

    Sign-off

    Engineer's inspection, permit closed, documentation in your hands.

What it costs

Priced in writing, after we've seen it.

What moves the price

  • Basement size and how much depth you're gaining
  • Soil conditions and access
  • Whether the walls need waterproofing while they're open

How we quote

Every quote is fixed and in writing after an on-site assessment. No allowances, no surprises.

Why AVH

Three reasons homeowners pick us for this

  • Engineered drawings and permits handled for you
  • Our own crew from excavation to slab, no subcontractors
  • Written warranty on the structural work
Questions

Asked about underpinning & basement lowering

Can we live in the house during underpinning?
Usually, yes. The work happens below grade and the house stays supported throughout. Expect noise and a busy driveway for a few weeks.
How much height can we gain?
Most homes gain enough for a code-compliant ceiling. We confirm the exact number after checking footings and soil.
Do you handle the permit?
Yes. Underpinning needs engineered drawings and a municipal permit. We coordinate both.

Cracks don't fix themselves. Let's look before it costs more.

A free, no-pressure assessment from the people who'll actually do the work.

Call (289) 880-7988
Call now